Facilities

Machinefabriek Bakker has the following facilities to serve you as a customer possible.

Machines and equipment for:

Welding of stainless steel, steel and aluminum by TIG, MIG-MAG and electrode welding processes

Underwater ship hull maintenance

At low tide, two ships can lay dry side by side up to a maximum width of 18 meters in total. Per tide there is +/- 6 hours of time available to work on the underwater ship hull, propeller, rudder etc.

Mobile crane

A mobile crane suitable for various lifting jobs on the quay in front of the Factory.

Hydraulic service

Various sizes of hydraulic hoses and couplings in stainless steel and steel are custom made in our workshop. Due to the wide range, we can supply a diverse range of hoses and couplings at short notice.