Underwater ship hull maintenance
At low tide, two ships can lay dry side by side up to a maximum width of 18 meters in total. Per tide there is +/- 6 hours of time available to work on the underwater ship hull, propeller, rudder etc.
Machinefabriek Bakker has the following facilities to serve you as a customer possible.
Machines and equipment for:
Welding of stainless steel, steel and aluminum by TIG, MIG-MAG and electrode welding processes